This project consists of further developing the current Acecore NOA drone as well as testing different collection and delivery options (box, locker, winch). A follow-up Hydrogen drone is to be operational by 2022 and a bigger one capable of carrying a larger payload by 2023. A control room as well as a registration or activation portal is also included in this testing environment. The project consists of purchasing, thoroughly researching/testing and making operational of drones and accessories. All conducted in compliance with the agreed testing and development process and specifications.
![](https://at-north.nl/app/uploads/2022/09/C88AA416-564B-4198-A723-914085CB52B2.jpeg)
![](https://at-north.nl/app/uploads/2022/09/img_0196-mfrh-original-scaled.jpg)